Certification Review and Registration of Project Welders SAEP-324

Following topics to be discussed in this article are

1 Scope related to Certification and Registration of Project Welders.
2 Conflicts and Deviations.
3 Applicable Documents and what requirements of Certification and Registration of Project Welders.
4 Definitions and Acronyms used in this article.
5 Responsibilities of Project Welders.
6 Instructions for getting Certification and Registration of Project Welders.

Appendix I – Table for Welder Criteria.
Appendix II – Template Job Clearance Card.
Appendix III – Flow Diagram of Radiographic Requirement for 1st Three Production Welds.

Certification Review and Registration of Project Welders SAEP-324

Certification Review and Registration of Project Welders SAEP-324.pdf

This Engineering Procedure indicates the base prerequisites for confirmation survey and enrollment of contractual worker welders chipping away at manufacture ventures.

Unless explicitly noted in any case the term welder will likewise mean welding administrator.

Welders Performance and Guidelines Criteria are given in Appendix I of this methodology.

Sample of Welder Job Clearance Card SA 4758 is given in Appendix II of this system to give consistency in utilization.

This method doesn’t make a difference to changeless Manufacturers Fabrication Facilities.

This method doesn’t make a difference to Maintenance Projects as characterized in Section Below.

General Requirements

Contractors, fabricators and merchants are liable for the testing and affirmation of welders working under their watch as per the overseeing Codes, norms, as well as particulars of each undertaking.

The venture overseer will reserve the option to require the expulsion or retest of any welder whenever because of unacceptable work or lackluster showing as indentified in Appendix I Welder Performance Guidelines.

Performance capability testing of welders carefully for tack welding is precluded.

For SMAW execution capability testing welders will be equipped for all passes and the full thickness of the test coupon.

The initial three (3) creation groove welds by each new agreement welder will be radiographed 100%. Radiograph acknowledgment will be as determined by the material Code.

Appendix I – Table for Welder Criteria

Appendix I – Table for Welder Criteria

Flow Diagram Of Radiographic Requirement for 1st Three Production Welds

Flow Diagram Of Radiographic Requirement for 1st Three Production Welds

Leave a Comment

error: Content is Protected.