This article is about 3G KPI Improvement Report 2nd and focusing to the engineers, technicians and supervisors. You will find lot of documents related to this article. Just navigate our website www.paktechpoint.com and find more articles. Please! Do not forget to subscribe our You tube channel also. Thanks in Advance.
PLEASE SUBSCRIBE OUR PAKTECHPOINT YOUTUBE CHANNEL
3G KPI Improvement Report
Contents
1. Summary 2
1.1 Summary of actions 2
1.2 Map of cluster 2
1.3 Site list 2
2. OSS KPI Achievement 2
2.1 RNC level improvement achievement 2
2.2 RNC level improvement achievement 2
2.3 Cluster level improvement achievement 2
2.4 Cluster level KPI comparison 2
3. DT results 3
3.1. DT comparison plots and Issues 3
3.2. Static Test comparison 3
4. Issues 3
4.1. Hardware Issues 3
4.2. Inconsistency check 3
4.3. Waiting CRs 4
5. Summary of CRs 4
6. Knowledge Transfer 5
7. Customer Complain Report 5
-
Summary
-
-
Summary of actions
-
We have to started second cluster optimization on Cluster_6.. Cluster_6 generally contains Kerman Provinces sites.. There are totally 31 NodeB in second cluster.. General problem is High drop rate and low accessibility rate due to some kind of congestion and transmission Link capacity problems..
We have solved congestion problems even Uplink Power congestion and HSUPA User congestion.. After solving of congestion there are PDU retransmission rate is started to deteriorate due to transmission link capacity and link quality problems..
-
-
Map of cluster
-
-
-
Site list
-
Site list:
KER0500
|
KER0511
|
KER0543
|
KER0501
|
KER0512
|
KER0544
|
KER0502
|
KER0532
|
KER0546
|
KER0503
|
KER0533
|
KER0706
|
KER0504
|
KER0534
|
KER0707
|
KER0505
|
KER0536
|
KER0709
|
KER0507
|
KER0538
|
KER0840
|
KER0508
|
KER0539
|
KER6003
|
KER0509
|
KER0540
|
KER6004
|
KER0510
|
KER0541
|
KER6005
|
KER6008
|
-
OSS KPI Achievemen
-
-
RNC level improvement achievement
-
After the solving of all type of congestion of second cluster , Rnc congestion rate and Rnc PS – Cs- Hsdpa – Hsupa Accessibility Rate is improved..
-
-
Cluster level improvement achievement
-
CR Description
|
CR Number
|
Results
|
Downlink CAC Threshold Changes
|
Rightel-RAN- CR-20150912-5948
|
Downlink congestion is cleared and all type accessibility affected with good condition
|
Max HSUPA Num / EAGCH / E-RGCH Channel Changes
|
Rightel-RAN- CR-20150913-5970
|
Hsupa User Congestion is degraded and all type accessibility affected with good condition
|
HS_SCCH Increase
|
Rightel-RAN- CR-20150913-5971
|
Throughput increased – increment of tput is not to much due to there are transmission link problem
|
SIB7 activation for Rtwp improvement
|
Rightel-RAN- CR-20150913-5973
|
Rtwp improved but improvement is not high due to to there are high external Rtwp problem
|
MaxTx Power Increase
|
Rightel-RAN- CR-20150914-6020
|
DL_Power cong improved
|
Intra Neighbouring Addition
|
Rightel-RAN- CR-20150914-6018
|
Missing neighbouring added
|
Pcpich Changes
|
Rightel-RAN- CR-20150916-6059
|
|
Parameter name
|
Num Of Cell
|
Downlink CAC Threshold Changes
|
378
|
Max HSUPA Num / EAGCH / E-RGCH Channel Changes
|
206
|
HS_SCCH Increase
|
372
|
SIB7 activation for Rtwp improvement
|
372
|
MaxTx Power Increase
|
68
|
Intra Neighbouring Addition
|
56
|
Pcpich Changes
|
65
|
-
-
Cluster level KPI comparison
-
Cluster_6 comparison shown in below table..
Note : Hsdpa/Hsupa throughputs are not improved due to there are PDU Retransmission Rate start to deteriorate by the transmission link capacity and link quality.. That issue waiting increment of Link capacity / Bandwidth definition by transmission department..
-
DT results
-
-
DT comparison plots and Issues
-
Here you will put DT plot of before and after test and show the improvement. Or you can show cross connection problems. Or other hardware issues.
-
-
Static Test comparison
-
Here you put Static test comparison to show improvement on throughput of uplink and down link
-
Issues
-
-
Hardware Issues
-
Problem description
|
Escalation date
|
Closed date
|
Result
|
IP Path Lost
|
8/31/2015
|
Not solved
|
|
Wbbp Board Overload alarm
|
8/31/2015
|
Not solved
|
|
RCU
|
8/31/2015
|
Not solved
|
|
very high PDU Retransmission Rate Problem
|
8/31/2015
|
Not solved
|
|
Wbbp Board (KER6002,KER0515)
|
9/6/2015
|
9/22/2015
|
solved
|
cross connection
|
9/12/2015
|
Not solved
|
|
IP Path lost
|
9/14/2015
|
Not solved
|
|
very high PDU Retransmission Rate
|
9/14/2015
|
Not solved
|
|
Rtwp problem on 90 Band cells
|
9/14/2015
|
Not solved
|
|
no RCU definition
|
9/14/2015
|
Not solved
|
|
IP Path Lost Problem
|
9/14/2015
|
Not solved
|
|
PDU Retransmission Rate
|
9/14/2015
|
Not solved
|
|
correction & Location
|
9/14/2015
|
9/23/2015
|
solved
|
correction site location and azimuth
|
9/15/2015
|
Not solved
|
|
PDU Retransmission Rate is very high
|
9/15/2015
|
Not solved
|
|
Rtwp problem
|
9/15/2015
|
Not solved
|
|
External Clock Reference Problem
|
9/21/2015
|
Not solved
|
-
-
Inconsistency check
-
-
There is not found any inconsistency..
-
-
Waiting CRs
-
There is no waiting CR..
-
Summary of CRs
CR Description
|
CR Number
|
Results
|
Downlink CAC Threshold Changes
|
Rightel-RAN- CR-20150912-5948
|
Success
|
Max HSUPA Num / EAGCH / E-RGCH Channel Changes
|
Rightel-RAN- CR-20150913-5970
|
Success
|
HS_SCCH Increase
|
Rightel-RAN- CR-20150913-5971
|
Success
|
SIB7 activation for Rtwp improvement
|
Rightel-RAN- CR-20150913-5973
|
Success
|
MaxTx Power Increase
|
Rightel-RAN- CR-20150914-6020
|
Success
|
Intra Neighbouring Addition
|
Rightel-RAN- CR-20150914-6018
|
Success
|
Pcpich Changes
|
Rightel-RAN- CR-20150916-6059
|
Success
|
-
Knowledge Transfer
CR meeting date
|
CR Number(s)
|
07 September 2015
|
All of CR
|
-
Customer Complain Report
TT number
|
Result (closed-pending to get support- waiting to get feedback from call center)
|
2004-1101-024-940303-1
|
waiting to get feedback from call center
|
2004-1210-009-940207-1
|
waiting to get feedback from call center
|
2004-1210-005-940514-1
|
waiting to get feedback from call center
|