3G KPI Improvement Report 2nd

This article is about 3G KPI Improvement Report 2nd and focusing to the engineers, technicians and supervisors. You will find lot of documents related to this article. Just navigate our website  www.paktechpoint.com  and find more articles. Please! Do not forget to subscribe our You tube channel also. Thanks in Advance.

PLEASE SUBSCRIBE OUR PAKTECHPOINT YOUTUBE CHANNEL

3G KPI Improvement Report

Contents
1. Summary 2
1.1 Summary of actions 2
1.2 Map of cluster 2
1.3 Site list 2
2. OSS KPI Achievement 2
2.1 RNC level improvement achievement 2
2.2 RNC level improvement achievement 2
2.3 Cluster level improvement achievement 2
2.4 Cluster level KPI comparison 2
3. DT results 3
3.1. DT comparison plots and Issues 3
3.2. Static Test comparison 3
4. Issues 3
4.1. Hardware Issues 3
4.2. Inconsistency check 3
4.3. Waiting CRs 4
5. Summary of CRs 4
6. Knowledge Transfer 5
7. Customer Complain Report 5
  1. Summary

    1. Summary of actions

We have to started second cluster optimization on Cluster_6.. Cluster_6  generally contains Kerman Provinces sites..  There are totally 31 NodeB in second cluster..  General problem is High drop rate and low accessibility rate due to some kind of congestion and  transmission Link capacity problems..
We have solved congestion problems even  Uplink Power congestion and  HSUPA User congestion..  After solving of congestion there are PDU retransmission rate is started to deteriorate due to  transmission link capacity and link quality problems..
    1. Map of cluster

3G KPI Improvement Report
    1. Site list

Site list:
KER0500
KER0511
KER0543
KER0501
KER0512
KER0544
KER0502
KER0532
KER0546
KER0503
KER0533
KER0706
KER0504
KER0534
KER0707
KER0505
KER0536
KER0709
KER0507
KER0538
KER0840
KER0508
KER0539
KER6003
KER0509
KER0540
KER6004
KER0510
KER0541
KER6005
KER6008
  1. OSS KPI Achievemen

    1. RNC level improvement achievement

After the solving of all type of congestion of second cluster , Rnc congestion rate and Rnc PS – Cs- Hsdpa – Hsupa Accessibility Rate is improved..
3G KPI Improvement Report
3G KPI Improvement Report
    1. Cluster level improvement achievement

CR Description
CR Number
Results
Downlink CAC Threshold Changes
Rightel-RAN- CR-20150912-5948
Downlink congestion is cleared and all type accessibility affected with good condition
Max HSUPA Num / EAGCH / E-RGCH  Channel Changes
Rightel-RAN- CR-20150913-5970
Hsupa User Congestion is degraded and all type accessibility affected with good condition
HS_SCCH Increase
Rightel-RAN- CR-20150913-5971
Throughput increased – increment of tput is not to much due to there are transmission link problem
SIB7  activation for Rtwp improvement
Rightel-RAN- CR-20150913-5973
Rtwp improved but improvement is not high due to to there are  high external Rtwp problem
MaxTx Power Increase
Rightel-RAN- CR-20150914-6020
DL_Power cong improved
Intra Neighbouring Addition
Rightel-RAN- CR-20150914-6018
Missing neighbouring added
Pcpich Changes
Rightel-RAN- CR-20150916-6059

 

Parameter name
Num Of Cell
Downlink CAC Threshold Changes
378
Max HSUPA Num / EAGCH / E-RGCH  Channel Changes
206
HS_SCCH Increase
372
SIB7  activation for Rtwp improvement
372
MaxTx Power Increase
68
Intra Neighbouring Addition
56
Pcpich Changes
65
    1. Cluster level KPI comparison

Cluster_6 comparison shown in below table..
Note :  Hsdpa/Hsupa throughputs are not improved due to there are PDU Retransmission Rate start to deteriorate by the transmission  link capacity and link quality.. That issue waiting increment of Link capacity / Bandwidth definition  by transmission department..
3G KPI Improvement Report
3G KPI Improvement Report
  1. DT results

    1. DT comparison plots and Issues

Here you will put DT plot of before and after test and show the improvement. Or you can show cross connection problems. Or other hardware issues.
    1. Static Test comparison

Here you put Static test comparison to show improvement on throughput of uplink and down link
  1. Issues

    1. Hardware Issues

Problem description
Escalation date
Closed date
Result
IP Path Lost
8/31/2015
Not solved
Wbbp Board Overload alarm
8/31/2015
Not solved
RCU
8/31/2015
Not solved
very high PDU Retransmission Rate Problem
8/31/2015
Not solved
Wbbp Board (KER6002,KER0515)
9/6/2015
9/22/2015
solved
cross connection
9/12/2015
Not solved
IP Path lost
9/14/2015
Not solved
very high  PDU Retransmission Rate
9/14/2015
Not solved
Rtwp problem on 90 Band cells
9/14/2015
Not solved
no RCU definition
9/14/2015
Not solved
IP Path Lost Problem
9/14/2015
Not solved
PDU Retransmission Rate
9/14/2015
Not solved
correction & Location
9/14/2015
9/23/2015
solved
correction site location and azimuth
9/15/2015
Not solved
PDU Retransmission Rate is very high
9/15/2015
Not solved
Rtwp problem
9/15/2015
Not solved
External Clock Reference Problem
9/21/2015
Not solved

 

    1. Inconsistency check

  1. There is not found any inconsistency..
    1. Waiting CRs

There is no waiting CR..
  1. Summary of CRs

CR Description
CR Number
Results
Downlink CAC Threshold Changes
Rightel-RAN- CR-20150912-5948
Success
Max HSUPA Num / EAGCH / E-RGCH  Channel Changes
Rightel-RAN- CR-20150913-5970
Success
HS_SCCH Increase
Rightel-RAN- CR-20150913-5971
Success
SIB7  activation for Rtwp improvement
Rightel-RAN- CR-20150913-5973
Success
MaxTx Power Increase
Rightel-RAN- CR-20150914-6020
Success
Intra Neighbouring Addition
Rightel-RAN- CR-20150914-6018
Success
Pcpich Changes
Rightel-RAN- CR-20150916-6059
Success
  1. Knowledge Transfer

CR meeting date
CR Number(s)
07 September 2015
All of CR
  1. Customer Complain Report

TT number
Result (closed-pending to get support- waiting to get feedback from call center)
2004-1101-024-940303-1
waiting to get feedback from call center
2004-1210-009-940207-1
waiting to get feedback from call center
2004-1210-005-940514-1
waiting to get feedback from call center

 