Architectural Inspector Checklists Part 2- Aramco CBT Exam Questions

This article is about Architectural Inspector Checklists Part 2- Aramco CBT Exam Questions related to topic of Doors, Frames, Wood & Plastic Doors, Storefronts, Metal Windows, Butts and Hinges, Locksets & Latchsets, Door Closers, Exit & Flush Bolts, Stops, Holders and Plates, Glazing, Glazed Curtain Wall  in Building, Plants and Petrochemical Plants as per International Codes & Standards.

Architectural Inspector Checklists Part 2- Aramco CBT Exam Questions related to topic of Doors, Frames, Wood & Plastic Doors, Storefronts, Metal Windows, Butts and Hinges, Locksets & Latchsets, Door Closers, Exit & Flush Bolts, Stops, Holders and Plates, Glazing, Glazed Curtain Wall

Architectural Inspector Checklists Part 2- Aramco CBT Exam Questions

DOORS CHECKLIST

Confirm doorways are as accreditedmeasurement, kind design, panel, lights, louvers and options and don’t have any defects resembling dents, buckles or warps. Confirm fabrication, development and workmanship and search for clean edges and joints, end and straightness.

Steel Doors, Windows and Frames Installation Procedure | Architecture

FRAMES CHECKLIST

Confirm fabrication and development of
body is as required. Confirm clean
joints, welded if required; confirm gauge,
measurement, straightness and options are as
required. Confirm frames are prefabricated,
if required.
Confirm further reinforcement is
offered at head, corners and {hardware}
places as required.

WOOD & PLASTIC DOORS CHECKLIST

Confirm tough framing for doorways and jambs is
as required
Confirm doorways are saved and dealt with correctly.
Guarantee doorways are saved flat and in clear, dry
environment. They need to be shielded from
filth, water and abuse. If saved for lengthy intervals,
doorways needs to be sealed with a non-water primarily based
sealer or primer. Doorways shouldn’t be uncovered to
extreme moisture, warmth, dryness or direct
daylight. Doorways ought to all the time be dealt with with
clear arms or whereas carrying clear gloves.
Doorways needs to be lifted and carried, not dragged
throughout each other. Confirm doorways are as accredited
and have identification and/or certification

STOREFRONTS CHECKLIST

Confirm elements or pre-assembled panels
are checked for transport harm after
uncrating; confirm measurement, form and thickness of
steel extrusions or components match full measurement
particulars when obtainable. Examine that gauges,
patterns, and colours are as accredited and match
samples.

METAL WINDOWS CHECKLIST

Discuss with Division 8 “Glazing 08800” for
relevant gadgets.
Confirm delivered home windows are of kind, measurement,
end and operation as accredited.

BUTTS AND HINGES CHECKLIST

Confirm ball bearing, oilite or nylon kind is
offered, as required.
Confirm stable brass, bronze, aluminum or
chrome steel is offered, if required.

LOCKSETS & LATCHSETS CHECKLIST

Predrilled or jig bored gives most correct
set up. After boring, guarantee no planing is
allowed on lockset edge.
Confirm mortise for strike gives for full
latchbolt projection. Hearth assemblies require
full throw and in some situations lifeless bolts
won’t latch with out full projection.

DOOR CLOSERS CHECKLIST

Confirm closers are hooked up to wooden doorways with
by bolts and grommet nuts and to steel
doorways with by bolts except in any other case
specified.
Observe operation of closers as quickly as
attainable after set up for correct operation,
resembling silent closing and clean operation at
arc opening. Confirm panic units are
correctly latching.

STOPS, HOLDERS AND PLATES CHECKLIST

Confirm each door is supplied with a door
cease, as required.
Confirm stops will go well with anticipated circumstances if
furnishings or tools structure is thought.

GLAZING CHECKLIST

Confirm varieties, thickness, high quality, sample and
end of glass are as required and glass is
labeled or in any other case recognized.
Confirm kind, supplies and strategies of glazing.
Confirm putty, glazing compound, tape,
gasketing, glazier factors, screws, shims,
separators, beads and particular sections are as
required.

GLAZED CURTAIN WALL CHECKLIST

Confirm elements or pre-assembled panels
are checked for transport harm after
uncrating ; confirm measurement, form and thickness of
steel extrusions or components match full measurement
particulars when obtainable. Examine that gauges,
patterns and colours are as accredited and match
samples.

Architectural Inspector Checklists Part 1- Aramco CBT Exam Questions

Check Ebooksterminal for more Information.

Leave a Comment

error: Content is Protected.