This article is about Civil Inspector Checklist Part 2 – Aramco CBT Exam Questions related to topic of Concrete – Concrete Forms and Accessories, Form Removal, Concrete Reinforcement, Cast-in-Place Concrete, Finishing and Curing, Pre-Cast Concrete for Project in Building, Plants and Petrochemical Plants as per International Codes & Standards.
Civil Inspector Checklist Part 2 – Aramco CBT Exam Questions
CIVIL INSPECTOR CHECKLIST PART 2 - ARAMCO CBT EXAM QUESTIONSConcrete – Concrete Forms and Accessories
- Confirm location, dimensions and grades
are as required. - Confirm formwork supplies are as
specified. Confirm formwork is correctly
sealed, oiled or wetted and remedy is
suitable with different supplies to be
utilized. - Confirm reused formwork is correctly
reconditioned and handled for reuse.
Form Removal
- Confirm concrete is sufficiently robust
earlier than removing of types and surfaces are
not broken or spilled by early removing. - Guarantee types stay in place till
expiration of curing interval required.
Concrete Reinforcement
- Confirm grade of metal delivered to jobsite
is recognized, as required. - Confirm metal is put in in accordance with
accepted drawings and of grade and sizes
indicated: bar size, bar diameter, bar-tobar spacing. Confirm spacing
is
coordinated to swimsuit items the place
masonry
partitions are
scheduled. - Confirm required clearance of metal from
earth and types is offered.
Cast-in-Place Concrete
- Guarantee company approval of types and
rebar is obtained previous to pour, if required. - Confirm necessities of concrete
specs have been met earlier than
supply or placement of concrete — assessments,
combine design, components, inspections, and many others. - Guarantee testing laboratory is notified prior
to pour and testing is organized at plant and
website.
Finishing and Curing
- Confirm sort of finishes on unformed
surfaces equivalent to easy, rubbed,
broomed, nonslip, uncovered combination, and
coloured is checked and offered, as
required. - Confirm screeds are offered as required
and wooden screeds are eliminated. - Confirm over-troweling is averted and
troweling is just not carried out whereas bleed
water is on floor.
Pre-Cast Concrete
- Verify required samples have been
submitted and accepted as to paint,
texture, kind, end, remedy, anchors
and reinforcement. Confirm mock-up is
offered and accepted, if required. - Verify particular gadgets and circumstances are
understood. - Confirm circumstances to obtain precast
materials are as required. Confirm structural
assist members are correctly situated,
put in and inside tolerance. Verify
erection contractor accepts circumstances.