Electrical Inspector Checklist | ARAMCO CBT Exam Questions

This article is about Electrical Inspector Checklist of ARAMCO CBT Exam Questions related to topic of Fire Alarm, Communications, Lighting, Bonding, Grounding, Switchboards and Panelboards, Transformers, Motor Control, Disconnects and Starters, Motors, Outlets, Cable Systems, Conductors, Underfloor Raceways, Busways, Raceways for Project in Building, Plants and Petrochemical Plants as per International Codes & Standards.

Electrical Inspector Checklist of ARAMCO CBT Exam Questions related to topic of Fire Alarm, Communications, Lighting, Bonding, Grounding, Switchboards and Panelboards, Transformers, Motor Control, Disconnects and Starters, Motors, Outlets, Cable Systems, Conductors, Underfloor Raceways, Busways, Raceways for Project in Building, Plants and Petrochemical Plants

Electrical Inspector Checklist | ARAMCO CBT Exam Questions

ELECTRICAL INSPECTOR CHECKLIST - ARAMCO CBT EXAM QUESTIONS

RACEWAYS CHECKLIST ELECTRICAL

  • Observe limitations required on use of inflexible conduit, thinwall conduit, versatile metallic
    conduit, plastic conduit, and different nonmetallic conduit (ex. liquidtight versatile metallic conduit).
  • Confirm conduit measurement complies with code and is
    acceptable for the appliance. Confirm required
    sorts of fittings are offered and are
    appropriate with conduit sort.
  • Confirm conduits are offered and correctly
    put in earlier than slabs on grade are put in.
    Examine thickness of slab to permit for conduit measurement.

BUSWAYS CHECKLIST ELECTRICAL

  • Confirm correct assist is offered at required
    intervals and transverse and longitudinal
    bracing is offered to forestall lateral
    motion in accordance with codes and the
    governing authorities.
  • Confirm provision for enlargement is in
    accordance with producersdirections.
  • Confirm busway housing is grounded by floor
    conductor both externally or internally.

UNDERFLOOR RACEWAYS CHECKLIST ELECTRICAL

  • Confirm cross-sectional dimensions are as
    required.
  • Confirm ample setting depth has been
    offered at junction packing containers.
    Confirm raceways are parallel with ground
    development, firmly supported at correct
    elevation and in straight alignment.

CONDUCTORS CHECKLIST ELECTRICAL

  • Confirm the kind of conductors, supplies, measurement,
    stranding and kind of insulation are as
    required.
  • Confirm pulling of conductors and cables is as
    required, utilizing appropriate gear and
    strategies. Enable no injury to sheath jackets
    or insulation.
  • Confirm connectors and joints are clear tight,
    and torqued as crucial.

CABLE SYSTEMS CHECKLIST ELECTRICAL

  • Confirm metal-clad cable is put in the place
    specified, chopping is carried out with out
    conductor injury and bushings are put in.
  • Confirm nonmetallic-cable is put in in areas
    allowed by contract paperwork and permitted
    by codes and is positioned in order to forestall
    driving of fasteners into cable. Code gauge
    safety plates are offered the place required.
  • Confirm cables are secured inside 12 inches of
    field or becoming and in any other case at intervals not
    exceeding limits for correct assist with out
    extreme sagging. Cable helps ought to be
    unbiased of assist members.

OUTLETS CHECKLIST ELECTRICAL

  • Confirm architectural drawings are referred to
    for comparability of all circumstances affecting
    format of shops. Coordinate work with different
    trades.
  • Confirm particular gear shops have been
    roughed-in per producers’ rough-in
    drawings.
  • Confirm ground shops of required sort are
    correctly positioned. Confirm dimensions if
    indicated or important. Request gear and
    furnishings format.

MOTORS CHECKLIST ELECTRICAL

  • Confirm motors have voltage ranking and quantity
    of phases to swimsuit provide system.
  • Confirm motor rotation is appropriate for pushed
    machine.
  • Confirm motors topic to vibration or mounted
    on adjustable bases are related with
    versatile metallic conduit. Confirm liquidtight or
    explosion-proof versatile metallic conduit are
    offered in damp or hazardous areas.

MOTOR CONTROL, DISCONNECTS AND STARTERS CHECKLIST

  • Confirm handbook disconnect swap is offered
    at every motor and motor starter, as required by
    code.
  • Confirm management equipment are furnished as
    required by operation (start-stop pushbuttons,
    pilot lights, selector switches and comparable
    gadgets).
  • Confirm motor full-load rated currents are
    in contrast with rankings of motor-running
    overcurrent protecting gadgets (heater).
    Confirm heaters of correct measurement are put in in
    starters.

TRANSMISSION AND DISTRIBUTION CHECKLIST ELECTRICAL

SERVICE CHECKLIST ELECTRICAL

  • Confirm provisions are made for service
    entrance system in accordance with utility
    firm necessities and are coordinated
    with drawings. Confirm clearances underneath
    service drops are offered.
  • Confirm sleeves and areas are offered of
    sizes required.
  • Confirm meter location and most important disconnect
    location are as specified or indicated on
    contract paperwork.

TRANSFORMERS CHECKLIST ELECTRICAL

  • Confirm pad for exterior transformer is of measurement
    required and site and set up technique
    are understood.
  • Confirm transformer is of sort required. Confirm
    noise doesn’t exceed specified limits.
    Confirm ultimate reference to versatile conduit.

SWITCHBOARDS AND PANELBOARDS CHECKLIST ELECTRICAL

  • Confirm house offered is minimal required by
    code and distance from deal with of prime swap
    or breaker to complete ground doesn’t exceed
    6’6.”
  • Confirm boards are rigidly and securely
    anchored to flooring and partitions with helps of
    ample power to assist weight and resist seismic forces.
  • Confirm floor fault safety has been
    offered the place required by NEC.

GROUNDING CHECKLIST ELECTRICAL

  • Visually examine all grounding system conductors,
    connections and electrodes as work progresses and
    confirm continuity of grounding conductors.
  • Confirm grounding connectors are accessible for
    inspection and guarded towards mechanical damage.
    If water piping system is used, examine that pipe is
    metallic and no insulating becoming is interposed in
    pipe between floor wire connection level and
    inside or exterior pipe system (N.E.C. 250-81
    metallic water piping system is at all times used
    supplemented if required).

BONDING CHECKLIST ELECTRICAL

  • Confirm bonding raceway programs, cable tray, and
    different enclosures adjust to NEC Article #250C.

LIGHTING CHECKLIST ELECTRICAL

  • Confirm fixtures are listed by a nationally
    acknowledged testing laboratory.
  • Confirm lighting format is coordinated with
    architectural drawings and discrepancies are
    reported. Confirm format is coordinated with
    work of different trades.
  • Confirm fixtures adjust to specified fixtures
    and equipment are offered.

COMMUNICATIONS CHECKLIST ELECTRICAL

  • Confirm limitations are offered between low
    voltage and line voltage wiring.
  • Confirm wiring terminations are recognized.
  • Confirm all wiring put in in gear
    cupboards are put in neatly racked, bundled
    and arranged with wire ties or in wireways
    inside cupboards.
  • Confirm as-built information are saved on all wiring
    deviations from contract paperwork.

FIRE ALARM CHECKLIST ELECTRICAL

  • Confirm gadgets are state fireplace marshal (or
    governing authority) and testing company listed.
  • Confirm system is put in by or underneath the
    direct supervision of manufacturing unit educated service
    technicians, the place specified. Examine accepted
    store drawing for set up.

For more information Ebooksterminal.

Electrical and Instrumentation QC PDF Notes for CBT Aramco

Electrical QC Notes & Electrical QC Question Paper