Instrument / Device Installation on Stand

This article is about Instrument / Device Installation on Stand in Petrochemical Plant.

Instrument / Device Installation on Stand in Petrochemical Plant

Instrument / Device Installation on Stand

  1. 102 * 52 MILD STEEL CHANNEL
  2. 6mm THICK MILD STEEL BACKPLATE
  3. CABLE GLAND – TO SUIT CABLE
  4. 10mm DIA. MILD STEEL R0D, 400mm LONG
  5. WORK SWITCH
  6. STOP PUSHBUTTON
  7. START PUSHBUTTON
  8. EMERGENCY STOP
  9. START/STOP PUSHBUTTON STATION
  10. ISOLATOR SP&N OR TP&N
  11. THREE PHASE,5 POLE SOCKET OUTLET.
  12. JUNCTION BOX
  13. FIRE ALARM BREAKGLASS UNIT
  14. 600h x 250w * 250d CONCRETE BASE ( BY CONTRACTOR)
  15. PERFORATED CABLE STRAP
  16. 12mm RAWLBOLT OR SIMILAR
  17. 150 * 150 * 25mm THICK MILD STEEL BASEPLATE
  18. 50 x 50 x 6 MILD STEEL ANGLE.
  19. U-BOLT C/W NUTS & WASHERS (TO SUIT HANDRAIL

NOTES.

I. IF CONCRETE SLAB IS NOT AVAILABLE, A SUITABLE PLINTH TD BE CAST
2. STAND TO BE OF WELDED CONSTRUCTION AND PAINTED AS PER THE PROJECT SPECIFICATION.
3. EMERGENCY STOP GUARD, BENT TO SHAPE AND WELDED TO BACKPLATE
4. COMBINATIONS OF CONTROL STATIONS WITH JUNCTION BOX MAY BE MOUNTED ON BACKPLATE SIZED TO SUIT.
5. A/R DENOTES ‘AS REQUIRED’.
6. CABLES MAY ONLY BE RUN ALONG GROUND WHEN FIXED ALONG A KICKPLATE. IN ALL OTHER CASES CABLE MUST COME VIA A SEALED DUCT OR FROM ABOVE.