This article is about Instrument / Device Installation on Stand in Petrochemical Plant.
Instrument / Device Installation on Stand
- 102 * 52 MILD STEEL CHANNEL
- 6mm THICK MILD STEEL BACKPLATE
- CABLE GLAND – TO SUIT CABLE
- 10mm DIA. MILD STEEL R0D, 400mm LONG
- WORK SWITCH
- STOP PUSHBUTTON
- START PUSHBUTTON
- EMERGENCY STOP
- START/STOP PUSHBUTTON STATION
- ISOLATOR SP&N OR TP&N
- THREE PHASE,5 POLE SOCKET OUTLET.
- JUNCTION BOX
- FIRE ALARM BREAKGLASS UNIT
- 600h x 250w * 250d CONCRETE BASE ( BY CONTRACTOR)
- PERFORATED CABLE STRAP
- 12mm RAWLBOLT OR SIMILAR
- 150 * 150 * 25mm THICK MILD STEEL BASEPLATE
- 50 x 50 x 6 MILD STEEL ANGLE.
- U-BOLT C/W NUTS & WASHERS (TO SUIT HANDRAIL
NOTES.
Advertisement
I. IF CONCRETE SLAB IS NOT AVAILABLE, A SUITABLE PLINTH TD BE CAST
- STAND TO BE OF WELDED CONSTRUCTION AND PAINTED AS PER THE PROJECT SPECIFICATION.
- EMERGENCY STOP GUARD, BENT TO SHAPE AND WELDED TO BACKPLATE
- COMBINATIONS OF CONTROL STATIONS WITH JUNCTION BOX MAY BE MOUNTED ON BACKPLATE SIZED TO SUIT.
- A/R DENOTES ‘AS REQUIRED’.
- CABLES MAY ONLY BE RUN ALONG GROUND WHEN FIXED ALONG A KICKPLATE. IN ALL OTHER CASES CABLE MUST COME VIA A SEALED DUCT OR FROM ABOVE.