Camera Lowering System
| Verify the camera lowering system was properly installed by lowering and raising the CCTV to the ground three full cycles. |
| Verify that CCTV is stable and locked at the top of the CLS. |
| Verify that network cable has proper strain relief within pole and is not being damaged by movement of pulleys and support cable. |
CCTV
| Verify quality of video and bandwidth setting. |
| Verify streaming video in both JPEG and H264 formats. |
| Verify pan, tilt, and zoom functionality. |
| Verify manual and auto focus capability. |
| Verify iris control. |
Installation
| Verify location of CCTV installation. |
| Verify height of pole. |
| Verify that CDOT-approved CCTV is installed. |
| Verify voltage to PoE injector. |
| Verify proper grounding of PoE injector power and network cable attachment. |
| Verify shielding requirements of network cable and cable type is appropriate for outdoor installation. |