This article is about Instrument / Device Installation on Stand in Petrochemical Plant.
Instrument / Device Installation on Stand
- 102 * 52 MILD STEEL CHANNEL
- 6mm THICK MILD STEEL BACKPLATE
- CABLE GLAND – TO SUIT CABLE
- 10mm DIA. MILD STEEL R0D, 400mm LONG
- WORK SWITCH
- STOP PUSHBUTTON
- START PUSHBUTTON
- EMERGENCY STOP
- START/STOP PUSHBUTTON STATION
- ISOLATOR SP&N OR TP&N
- THREE PHASE,5 POLE SOCKET OUTLET.
- JUNCTION BOX
- FIRE ALARM BREAKGLASS UNIT
- 600h x 250w * 250d CONCRETE BASE ( BY CONTRACTOR)
- PERFORATED CABLE STRAP
- 12mm RAWLBOLT OR SIMILAR
- 150 * 150 * 25mm THICK MILD STEEL BASEPLATE
- 50 x 50 x 6 MILD STEEL ANGLE.
- U-BOLT C/W NUTS & WASHERS (TO SUIT HANDRAIL
NOTES.
I. IF CONCRETE SLAB IS NOT AVAILABLE, A SUITABLE PLINTH TD BE CAST
2. STAND TO BE OF WELDED CONSTRUCTION AND PAINTED AS PER THE PROJECT SPECIFICATION.
3. EMERGENCY STOP GUARD, BENT TO SHAPE AND WELDED TO BACKPLATE
4. COMBINATIONS OF CONTROL STATIONS WITH JUNCTION BOX MAY BE MOUNTED ON BACKPLATE SIZED TO SUIT.
5. A/R DENOTES ‘AS REQUIRED’.
6. CABLES MAY ONLY BE RUN ALONG GROUND WHEN FIXED ALONG A KICKPLATE. IN ALL OTHER CASES CABLE MUST COME VIA A SEALED DUCT OR FROM ABOVE.