Instrumentation and Control Books in Urdu for Technician and Engineers

Instrumentation and Control Books in Urdu for Technician Engineers

Instrumentation and Control Books in Urdu for Technician Engineers
Instrumentation and Control Books in Urdu for Technician Engineers

Field Instrumentation Part 1

Wait if Document is not loading……………..

Field Instrumentation Part 1

 

Field Instrumentation Part 2 | Book in Urdu

Industrial Instrumentation Vibration and Speed | Book in Urdu

Industrial Instrumentation Pressure and Flow | Book in Urdu

Industrial Instrumentation Level | Book in Urdu

Industrial Instrumentation Control Valve | Book in Urdu

Industrial Instrumentation Temperature | Book in Urdu

4.1       Contractor will furnish all tagged instruments and control devices as listed in the Instrument Summary. The contractor’s responsibility for each item is defined on the contract installation drawings.

 4.2       The contractor shall furnish all materials described on the contract drawings unless specifically indicated otherwise. The contractor shall furnish all miscellaneous and incidental materials necessary for a complete and operable system.

 4.3       The contractor shall install all instruments, control devices, and related materials in accordance with the contract drawings and other construction specifications.

4.4       Unless otherwise indicated, the mechanical contractor shall install all in-line devices, control panels, and process taps up to and including the primary shutoff valve. In-line devices include all items necessary to complete the process piping system for pressure testing.

 4.5       The contractor shall receive, store, and account for all instruments and materials that are to be installed under this contract. Special care shall be taken to ensure that items which are furnished “Cleaned for Oxygen Service” do not become contaminated. The furnished protective packaging shall remain on the process connections of such items until the final connection of the process leads is made.

 4.6       Penetration of the cold box is not permitted. All tube/instrument supports secured to the cold box will be attached by welding only. Do not weld supports to cold box panels designated as removable or route tubing to interfere with removal.

  INSTRUMENT LOCATIONS

 5.1       The placement of instruments on the contract drawings are approximate, and the contractor shall not mount instruments in a manner that obstructs the operation or maintenance of equipment. The instruments shall be accessible and removable for maintenance.

 5.2       The installation of instruments shall not obstruct the following:

Walkways

Platforms

Ladders

Stairs

The operation, maintenance or removal of equipment, control panels, or overhead cranes.

 5.2.1   All tubing installed over walk/access ways shall be a minimum of 2285 mm (7 ft 6 in) above grade or platform elevation.

 5.3       All instruments and control devices installed by the contractor shall be adequately supported even if a specific support detail is not shown on the contract drawings. Items such as regulators and pneumatic relays may not be supported solely by the tubing. They shall be independently supported.

 

 

 

 

 

 

 

 

 