HVAC Ducting 1. Working with Ducts and Sealants
2. Duct sheet sharp edges contact with Machine or Equipment.
• Only Skilled technicians & trained laborers shall do the job.
• Prior to work, Foreman/Supervisor shall conduct toolbox meeting & T.S.T.I
• Competent Foreman/Supervisor with good safety knowledge shall be deputed for the task
• Safety Officer shall frequently monitor the job. Workers should wear complete required PPE.
• All hand tools shall be in good condition.
Engineer, Supervisor Scaffolding installations
Scaffolding
installations
1. Structure Collapse
2. Fall Injury
3. Equipment/Property
Damage
• Erection and assembly shall be done by trained and authorized person.
• Erection to be carried out on firm/safe ground with acceptable materials by experienced men under the direction of a competent supervisor.

• Scaffolding shall be Inspected & Tagged.

Engineer, Supervisor,
Scaffolding inspectors
(Aramco Approved Inspectors).
Sanitation &
Housekeeping
1. Hazard Environment
2. Infection
• Safe means of getting in and out from working places shall be provided. Such places shall be kept clean and un obstructed at all times.
• Access to working platforms will be achieved by providing a separate ladder/ tower or via a cantilevered access platform in order not to obstruct
the working platform and to minimize the risk of persons falling through the gap in the guard rail or decking.
• Necessary periodic inspections shall be carried out to ensure safety standards are adhered.
• Working levels to be checked for conformance to safety standards before their usage.
Engineer, Supervisor,
Scaffolding inspectors
Leak Test Accidental air/water blast. • Prior to leak tests the test pressure shall be conformed and all joints shall be checked for leaks.
• Put barricade and signages of that area, under testing and needs to assian Watchman also.
Engineer, Supervisor
Insulation Breathing of dust particles of the insulation materials. • All personnel working with insulation material shall wear proper personal protective equipment’s to avoid
inhaling dust particles. Approved Mask ie.N95.
Engineer, Supervisor,
technician
Power Tools Personnel Injury • All power tools to be handled carefully to avoid personal injuries. Wherever possible, safeguards shall be fitted to the equipment.
• Only trained & certified operators to use power tools.
• All power Tools must be Inspected & Color coded monthly As per Aramco Procedure.