In this article
This article is about Piping QC CBT Questions related to topic of Flange Joint Tightening Methods Activity as per SAEP-351.
PIPING QC CBT QUESTIONS | FLANGE JOINT TIGHTENING METHODS
FLANGE JOINT TIGHTENING METHODS
- Torque Wrench Method per SAEP-351.
- o Torque wrench should be calibrated.
o Apply lubricant to stud thread and face of nut contacting the flange.
o All stud and nuts installed should be hand tight.
o All stud should be number.
o Studs are tighten as number with impact wrench or equivalent following bolt tightening sequence. - 1st stage tightening @30% of required torque (maximum)
- o Required torque value and actual attained value are recorded in Bolt Tightening Report.
o Final Tightening to ±5% of torque required (actual torque)
o After tightening all bolts have full thread engagement with the nut. - Note: Complete engagement (less 1 full thread) is acceptable (ASME B31.3 par. 335.2.3)
- Bolt Tensioning Method (HYDRATIGHT) – 50% Tensioning Method
o Pressure gauge in the Tensioning Machine are calibrated.
o Mark bolts in 2 sets, set A and set B.
o Tensioners are fitted to every other bolt of set A.
o Pressurized the tensioner to pre-determined “pressure A” per approved procedure (this is repeated 2 more times).
o Transfer tensioner to set B bolts and pressurized to pre-determined pressure B and tighten nuts (this should be repeated 2 times).
Note: Pressure B is lower in value than pressure A.
o After tensioning, Break Loose Pressure is verified to be greater than or equal to pressure B by the following steps
-
- Fit the tensioner to one of the tension bolt in set A.
- Pressurized slowly until the nut is loosen using Tommy Bar and socket.
- Once the nut moves, stop pressurizing and record the achieved pressure.
- This is the “Break Loose Pressure” (Note:If BLP < pressure B, Tensioning is fail)
Piping QC Notes & CBT Aramco | Piping Erection & Installation
Aramco QC Questions for all QC Engineers | CBT Test
For more knowledge please check Ebooksterminal.com
Following keywords for this topics are
- Flange Bolt Tightening Procedure.
- Bolt Torquing and Tensioning Procedure.
- Flange Management Procedure.
- Flange Management Checklist.
- Bolt Tightening Procedure for Structural Steel.
- Bolt Tightening Procedure Pdf.
- Flange Bolt Tightening Sequence Pdf.
- Criss Cross Tightening Sequence.
- Saudi Aramco Piping Qc Interview Questions.
- Piping Qc Notes.
- Aramco Cbt Exam Questions Piping.
Discover more from PAKTECHPOINT