Eaton 480V SWR Breaker Function Test Checklist
Electrical Switchgear Concept | Types | Applications | Calculations | Tests
Close breaker from Breaker Control Switch. |
Breaker Closed. |
Red Light operational & lens in place. |
Open breaker from Breaker Control Switch. |
Breaker Open. |
Green Light operational & lens in place. |
Counter Operational. |
Breaker Position Indication Operational. |
Spring Condition Indication Operational. |
Digitrip display operational. |
Manual ON/OFF Control Operational (On/Off switches under plastic covers on front of breaker). |
Breaker connected indication = Red. |
Racking Mechanism Operational – Rack out breaker. |
Breaker Test indication = Yellow. |
Breaker Disconnected indication = Green. |
Pull breaker out of cubicle with handles and slide (do not remove from rails). |
Verify label on side of breaker matches label on door of cubicle (feeder breaker no./cubicle no.). |
Shutters Closed. |
Manually charge spring, close breaker, open breaker. |
Visually inspect control wiring plugs in the top center of the cubicle, ensure they are not broken. |
Does the door open and close easily (alignment). |
Rack breaker back in. |
Charging Motor Operational. |
Powell 4.16kV SWR Breaker Function Test Checklist
Close breaker from Breaker Control Switch. |
Breaker Closed. |
Red Light operational & lens in place. |
Open breaker from Breaker Control Switch. |
Breaker Open. |
Green Light operational & lens in place. |
Counter Operational. |
Breaker Position Indication Operational. |
Spring Condition Indication Operational. |
Breaker connected indication. |
Shutter open indication = Red. |
Racking Mechanism Operational – Rack out breaker. |
Breaker Test indication. |
Breaker Disconnected indication. |
Shutter Closed indication – Green. |
Disconnect control cable from front of breaker and roll breaker out of cubicle. |
Verify label on side of breaker matches label on door of cubicle (feeder breaker no./cubicle no.). |
Shutters Closed. |
Ensure rear door of cubicle will open. |
Visually inspect rear door latch mechanism and ensure it is not bent/broken (lower left rail near rear of cubicle). |
Does the door open and close easily (alignment). |
Rack breaker back in. |
Charging Motor Operational. |
Ensure rear door of cubicle will not open. |
Eaton 4.16kV MCC Contactor Function Test Checklist
Disconnect operates correctly (open and close) – freely, no excessive force required. |
Red arc barriers are in place between the T-lead connections, fuses, & bus on top of contactors. |
Shutters are closed when disconnect is open. |
Door will not open when disconnect is closed. |
Mechanical indicators are operational. |
All components are in good condition – no damaged, loose, or missing parts. |
Contactor closes properly. |
Contactor opens properly. |
Multilin trip contact opens contactor (if this can be tested). |
METHOD STATEMENT FOR TESTING & COMMISSIONING OF SWITCHGEAR