This article is about 3G KPI Performance Report and focusing to the engineers, technicians and supervisors. You will find lot of documents related to this article. Just navigate our website www.paktechpoint.com and find more articles. Please! Do not forget to subscribe our You tube channel also. Thanks in Advance.
PLEASE SUBSCRIBE OUR PAKTECHPOINT YOUTUBE CHANNEL
PLEASE SUBSCRIBE OUR PAKTECHPOINT YOUTUBE CHANNEL
3G KPI Performance Report
Table of Contents
1 Drive Test Information 2
1.1 Site Information 3
1.2 City – Drive Route (Google Map) 4
1.3 Drive Test Configuration: 4
2 DT Results 4
∙ DT RSCP Plots 5
∙ DT RSCP Histogram Plots 5
∙ DT EcNo Plots 6
➢ DT EcNo Histogram Plots 7
➢ Bad Events and bad coverage Patch Analysis and Recommendation 9
-
Drive Test Information
In this report the performance status is shown for Islamabad cluster 06. Drive test started on 24th June, 2015 and got completed on 27th June, 2015
Site Information
Islamabad cluster 06 consists of the following sites and routes;
RNC
|
SiteId
|
SiteName
|
Cluster
|
LAC
|
RAC
|
803
|
3084
|
ISB3084H_OPPB12
|
ISL_CL6_HU
|
30203
|
152
|
803
|
3105
|
ISB3105H
|
ISL_CL6_HU
|
30203
|
152
|
803
|
3148
|
3148H
|
ISL_CL6_HU
|
30203
|
152
|
803
|
8194
|
ISB8194H_GOLRA
|
ISL_CL6_HU
|
30203
|
152
|
803
|
8891
|
RUR8891H_TARNOL
|
ISL_CL6_HU
|
30203
|
152
|
803
|
9259
|
9259H_G
|
ISL_CL6_HU
|
30203
|
152
|
803
|
9276
|
9276H
|
ISL_CL6_HU
|
30203
|
152
|
803
|
9290
|
ISB9290H_3DPLAZAG13
|
ISL_CL6_HU
|
30203
|
152
|
803
|
9292
|
ISB9292H_SANGHJANI
|
ISL_CL6_HU
|
30203
|
152
|
803
|
9628
|
RUR9628H_GOLRASTATION
|
ISL_CL6_HU
|
30203
|
152
|
803
|
9671
|
ISB9671H
|
ISL_CL6_HU
|
30203
|
152
|
803
|
9700
|
ISB9700H_E11MARKAZ
|
ISL_CL6_HU
|
30203
|
152
|
803
|
9730
|
ISB9730H_SHAHALAHDITTA
|
ISL_CL6_HU
|
30203
|
152
|
803
|
9987
|
ISB9987H_GHAURITOWMPIII
|
ISL_CL6_HU
|
30203
|
152
|
803
|
50025
|
50025H
|
ISL_CL6_HU
|
30203
|
152
|
803
|
50054
|
50054H
|
ISL_CL6_HU
|
30303
|
153
|
City – Drive Route (Google Map)
Drive Test Configuration:
We connected 3 Mobiles for coverage/quality test and the testing procedure for UMTS drive is as follows:
- MS1: UMTS Lock (30sec call 10sec idle).
- MS2: Auto Mode (180sec call 10sec idle).
- MS1: UMTS Lock – continuous download through FTP/Internet
Overview:
Cluster 6 is a remote cluster and has very less number of sites. Drive for Cluster 6 was conducted to check the
impact of 40W implementation. Coverage and quality comparison of post 40W and pre drives conducted in
November 2014 is shown below
impact of 40W implementation. Coverage and quality comparison of post 40W and pre drives conducted in
November 2014 is shown below
- RSCP has lowered as compared to pre drive due to multiple reasons.
- Cluster 6 is a remote cluster and a lot of area is being served by overshoots where there aren’t any dedicated sites to serve the purpose.
- Pre drive was conducted in November 2014 and network was a lot less loaded at that time so with the increase in number of users the footprint has also shrinked.
- EcNo is significantly better in post drive. Major factor in improved EcNo is that in pre drive both CS and PS services was checked in one single drive and due to high power usage of HSPA services, EcNo was degraded.
Whereas in current drives, methadology is changed an bit with separate drives for CS and PS are being conducted
DT EcNo Plots
3G Mobile (The Mobile is UMTS locked)
|
G Mobile (Auto Mode)
|
DT EcNo Histogram Plots
DT HSDPA Throughput Plot
DT EcNo Histogram Plots
DT KPI Summary:
Drive Test KPIs
|
Results
|
|
S. No.
|
KPI
|
|
1
|
Speech Call Setup Success Rate
|
100%
|
2
|
Speech Drop Call Rate/drops
|
0.09%
|
3
|
Soft Handover Success Rate
|
100%
|
4
|
IRAT Handover Success Rate
(If Failures were less than 3 in the cluster, KPI will be neglected)
|
100%
|
5
|
Inter Frequency HO Success Rate
(If Failures were less than 3 in the cluster, KPI will be neglected)
|
100%
|
6
|
Coverage Rate (RSCP) (RSCP>-95)
|
91.3%
|
7
|
Ec/Io Rate (EcNo > -9)
|
85%
|
8
|
HSPA Moving Throughput(kbits/sec)
|
6728.31
|
Abnormal Events Analysis and Recommendation
Event
|
Count
|
Blocked Calls
|
0
|
Dropped Calls
|
1
|
Dropped Call Analysis
Call was dropped while re-establishment procedure near site 9312. Following action required.
Cell Name
|
Action
|
9312_3
|
New site recommendation in the area
Redesign Possibility on 9290_2/5 and 3148
|
Weak Coverage and multi dominancy analysis and Recommendation
- Weak Coverage at G13/G14
Currently, there is no on-air 3G sites in the area and it is being covered by surrounding sites overshoot.
3G coverage will improve with the help of new sites. However for improvement of QOS and reduce
multiserver redesigns can be performed.
3G coverage will improve with the help of new sites. However for improvement of QOS and reduce
multiserver redesigns can be performed.
Patch
|
Action
|
G13/G14
|
New site recommendation
|
Kashmir Highway near G13/G14
|
ISB9987H_1_GHAURITOWMPIII audit and redesign
|
-
Weak Coverage/Multi server near 8891 turnol
Low coverage of 8891 and Illogical serving of 3084 ¼ creating multi dominancy, weak coverage and
bad EcNo near site 8891
bad EcNo near site 8891
Patch
|
Action
|
Near 8891
|
Redesign of 8891 and 3084
|
-
Weak Coverage/Multi server near 3148
Low coverage of site 3148 creating degraded EcNo and weak coverage in the highlighted area
Patch
|
Action
|
G 13/4 near 3148
|
Redesign of site 3148
|
-
Weak Coverage/Multi server near 9628
Small EcNo patch near 9628 due to overshooting of cell 9544 2 and 5 with strong levels.
Patch
|
Action
|
GolraStation Near 9628
|
Redesign of site 9544 2/5
|
-
Weak Coverage/Multi server near 9628
Weak RSCP in E11 due to Interferq activity and illogical serving of 8194_6 and 8874_4
Patch
|
Action
|
E 11 Weak coverage
|
10712 CPICH tuning + Redesign on 8194_6 and 8874_4
|
Summary
Following actions are required for improvement of coverage in the ISB_Cluster 06.
- Need to on air sites in G13 and G14 for good coverage
- Redesigns are required to cater over shooters creating illogical serving and multi dominancy