Architectural Inspector Checklist – Aramco CBT Exam Questions

This article is about Architectural Inspector Checklist – Aramco CBT Exam Questions related to topic of Framing & Furing, Plaster, Framing System, Gypsum Board, Wall Tile, Mortar Set,  Floor Tile, Terrazzo, Wood Flooring, –Parquet Flooring,resilient Flooring, Suspension Systems, Acoustical Insulation & Barriers, Paints & Coatings, Manufactured Casework, Drapery in Building, Plants and Petrochemical Plants as per International Codes & Standards.

Architectural Inspector Checklist - Aramco CBT Exam Questions related to topic of Framing & Furing, Plaster, Framing System, Gypsum Board, Wall Tile, Mortar Set,  Floor Tile, Terrazzo, Wood Flooring, --Parquet Flooring,resilient Flooring, Suspension Systems, Acoustical Insulation & Barriers, Paints & Coatings, Manufactured Casework, Drapery

Architectural Inspector Checklist – Aramco CBT Exam Questions

ARCHITECTURAL INSPECTOR CHECKLIST - ARAMCO CBT EXAM QUESTIONS

FRAMING & FURING

Confirm supplies are non-corrosive the place uncovered to exterior and damp circumstances, if
required.

Confirm stud spacing is as required. Confirm studs are doubled-up at jambs and particular reinforcement and heavy gauge studs are offered, as required. Confirm studs are set to permit for vertical motion, equivalent to shrinkage and slab deflection.

Confirm studs are friction match or securely anchored to runner tracks. Confirm soundproofing, equivalent to caulking beads, is offered at flooring and partitions as required.

PLASTER

Confirm plaster combine, proportions and mixing tools are as required and ample.

Confirm areas to be plastered have been heated earlier than set up and provision is made for regulated air flow.
Confirm masonry and concrete surfaces which might be immediately plastered have been roughened, cleaned and dampened and bonding necessities are met, together with means to keep away from telegraphing masonry joints.

Confirm setting and curing instances are as required. Guarantee minimal cement plaster is moist cured for at least 48 hours.

Confirm adjoining areas and surfaces are protected throughout plastering operations. Confirm correct kind of plaster required for numerous forms of areas is offered.

FRAMING SYSTEM

Confirm materials is saved in dry location and doesn’t overload ground programs.
Confirm metallic framing supplies are galvanized the place uncovered to exterior and damp circumstances and the place in any other case required.
Confirm wooden framing supplies are straight and correctly cured and chemically handled for hearth resistance or different properties, as required.

Confirm stud spacing is as required, studs are doubled-up at jambs and particular reinforcement and heavy gauge studs are offered as required.
Confirm studs are set to permit for vertical motion, equivalent to shrinkage and slab deflection.

GYPSUM BOARD

Confirm company inspection is carried out earlier than closing-in, if required.
Confirm kind, thickness, size and edges are as required. Confirm if horizontal or vertical
software is required.
Confirm kind of nail or fastener, gauge, size and spacing are offered, as required. Confirm
whether or not particular screwing or nailing is, required.

WALL TILE, MORTAR SET

Confirm studs and furring are correctly anchored and braced.
Confirm backing for equipment and partitions is in place.
Confirm waterproof membrane is put in, if required.
Confirm lath is correctly positioned, lapped and tied, with galvanized lath and wires in moist areas and galvanized or painted lath in dry areas as specified.

FLOOR TILE

Confirm non-slip tile is offered for required areas.
Confirm all masonry thresholds or metallic edge bars are set to complete grade.
Guarantee ground drains are set to complete grade at low level.

TERRAZZO

Confirm substrate to obtain terrazzo will present good bonding and is clear and freed from oil, dust and different deleterious matter. Confirm required divider strips, inserts and
reinforcements are offered and structure and spacing are understood. See that safe anchorage, correct elevation and tight joints are offered. Confirm enlargement strips are
offered, as required.

Confirm precast supplies are readily available as permitted and put in as required.

WOOD FLOORING

Confirm areas to obtain flooring are closed-in and ample temperature of above 50° is offered and maintained. Don’t enable overheating.

WOOD STRIP FLOORING
Confirm ground materials temperature has been conditioned.
Confirm subfloor floor is securely nailed, degree, even jointed, cleaned and freed from defects which may have an effect on end flooring.

Confirm felt paper (“slip sheet”) or underlayment is offered as required.

PARQUET FLOORING

Confirm floor of substrate, if concrete, is dry, even, degree at joints, clear and in any other case acceptable. Guarantee moisture meter check is carried out, if required.

RESILIENT FLOORING

Confirm kind, measurement, thickness, sample and colour of fabric are as permitted. Use single lot for anybody space.
Confirm primer, adhesive or cement is as required.
Confirm base complies with approvals regarding measurement, thickness, cove, colour and kind, aw nicely as molded exterior, inside and ends.

SUSPENSION SYSTEMS

Confirm structure of suspended system is understood and coordinated with work of different trades to permit ample plenum area and keep away from interference.
Confirm hangers of correct materials, gauge, and spacing are offered, as required. Confirm intermediate hangers and bridging are offered as required by discipline circumstances.

ACOUSTICAL INSULATION & BARRIERS

Confirm batts are of thickness and density required and are recognized.
Confirm batts are put in tightly to all adjoining surfaces, cutouts and edges and all areas are utterly crammed.

PAINTS & COATINGS

Confirm storage space for portray supplies is nicely ventilated and used rags and particles are eliminated from storage space.
Confirm colour schedule is full and understood. Confirm permitted colour samples are on jobsite and
jobsite “paint-outs” are matched in opposition to samples. Earlier than software, verify stopping factors for change of colour and end. Affirm necessities for discipline mock-ups.

MANUFACTURED CASEWORK

Confirm blocking is offered to obtain supplies, as required.
Confirm certificates or grade stamps are offered.

DRAPERY

Confirm blocking and backing are offered, as required.
Confirm stacking and panel overlapping are offered, as required.


Discover more from PAKTECHPOINT

Subscribe to get the latest posts to your email.

Leave a Comment

error: Content is Protected.