This article is about Architectural Inspector Checklists Part 1- Aramco Cbt Exam Questions related to topic of Waterproofing, Insulation, Rigid Insulation, Reflective Insulation, Loose Fill Insulation, Shingles & Roofing Tiles , Wood Shingles & Shakes, Asphalt Shingles, Slate Shingles, Concrete & Clay Tile, Membrane Roofing, Flashing & Sheet Metal, Gutters, Downspouts, Base & Cap Flashing, Other Roof Flashing, Wall Flashing, Cementitious Fireproofing in Building, Plants and Petrochemical Plants as per International Codes & Standards.
Architectural Inspector Checklists Part 1- Aramco Cbt Exam Questions
ARCHITECTURAL INSPECTOR CHECKLISTS PART 1- ARAMCO CBT EXAM QUESTIONSWATERPROOFING
The place required by contract paperwork or warranties, confirm that waterproofing is put in by producer’s accredited installers. Earlier than waterproofing or dampproofing subcontractor is allowed to start work, see that:
INSULATION
Confirm supplies are of kind required (surfaces, therapy, rankings, sizes, thickness, and many others.)
RIGID INSULATION
Confirm wooden nailers/stops are offered, as required. Guarantee vapor barrier is offered, if required. Verify that vapor barrier seals insulation at gravel stops, partitions, and openings.
REFLECTIVE INSULATION
Confirm batt insulation is of sufficient width to suit between framing members and is of specified thickness or “R” worth.
LOOSE FILL INSULATION
Confirm there is no such thing as a settlement. Confirm there aren’t any voids.
SHINGLES & ROOFING TILES
Confirm delivered supplies are of grades, varieties, shapes, sizes, colours, fire-rated classification and sample texture required, as relevant.
WOOD SHINGLES & SHAKES
Confirm underlayment, the place required, is offered and put in with correct lapping shingle model. Confirm publicity and fastening is as required, format present full shingle programs and general alignment is managed. Evaluate sample is indicated.
ASPHALT SHINGLES
Confirm underlayment or membrane is offered, if required. Confirm slope is as required. If roof surfaces don’t have adequate slope, contact architect earlier than set up of roofing begins.
SLATE SHINGLES
See objects above the place relevant.
CONCRETE & CLAY TILE
Confirm underlayment, the place required, is offered and put in with correct lapping shingle model.
MEMBRANE ROOFING
Confirm supplies of varieties required are offered. Confirm softening level of bitumen is as required. Confirm supplies are identifiable and adjust to ASTM or FS requirements. Confirm roll roofing is stood on finish and saved freed from contact with earth or moisture. Confirm protecting coverings of saved roll roofing is vented so condensation is not going to happen.
FLASHING & SHEET METAL
Confirm delivered materials is of accredited kind, form, gauge, metallic, fabrication and priming, as required, and all equipment are offered.
DOWNSPOUTS
Confirm lengths are so long as sensible and in accordance with specs. Confirm slip joints in course of circulation or allowance for motion is offered.
BASE & CAP FLASHING
Confirm flashing is offered to swimsuit situations: cant, dimension, gauge, and fabrication.
WALL FLASHING
Confirm places for flashings fabrication and design with contractor. Confirm lap, flip up, location in wall, depth in masonry, size, and many others. are as required.
CEMENTITIOUS FIREPROOFING
Confirm set up is by a agency accredited by the sprayed fireproofing materials producer. Confirm fireproofing offers fireresistance rankings as examined by acceptable laboratories. Confirm producers’ information and directions for correct utility of sprayed fireproofing are on file.