High strength, non shrink cementitious construction grout -CIVIL

This article is about High strength, non shrink cementitious construction grout – CIVIL and focusing to the engineers, technicians and supervisors. You will find lot of documents related to this article. Just navigate our website  www.paktechpoint.com  and find more articles. Please! Do not forget to subscribe our You tube channel also. Thanks in Advance.

PLEASE SUBSCRIBE OUR PAKTECHPOINT YOUTUBE CHANNEL

High strength, non shrink cementitious construction grout

Shrinkage compensated, cementitious grouts for use in bedding, grouting & precision bearing operations.

1. FOUNDATION PREPARATION:

1 . Preparation of the concrete surface to which the grout will bond should be carried out before the base plate is installed.
2 . Prepare the concrete surface using a chipping hammer, grit blasting or high pressure water jetting, to leave a roughly textured, clean surface, free from all forms of contamination. Bush hammering or similar method which can fracture
leave it in place is not permitted.
3. Preparation should cover the full extent of the surface which is intended to be in contact with grout.
4. Where it is indicated that bolts ere to be anchored within the grout. bolt pocket formers should be shaped to form cone, helping to ensure stresses that build up when the bolts are tightened are transmitted to the foundation.
5. Bolt pocket former-s should be made from materials that are easy to remove, but leave a rough concrete surface texture when stripped.
6. All surfaces and bolt pockets to receive grout must be clean and free of oil, dust,dirt, paint and residual curing compound .
7. All base plates, holding down bolts etc., are to be free of rust, oil, dirt or contaminants that could impair bond.

FORM WORK

1 . Before fixing formwork, ensure the foundation area and bolt holes are clean.
2. Formwork fitted around the base plate to contain the grout must be as watertight as is practical, to prevent grout loss.
3. The top of the formwork should be a minimum of 2.5 cm above the underside of the base plate.

4. For large base plate pours or when the gap between base plate and foundation concrete is of less than 2.5 cm depth, the formwork should be higher to allow a pressure head to build up.
5. On the pouring side, which should be the shortest distance across the base plate, a ‘hopper’ should be constructed to allow a pressure head sufficient to enable grout to flow to the full width of the pour. Th e form should be fixed with the top
sloping away from the base plate at a 45c angle to form a slope down which the grout can be poured.
6. The formwork should be fixed to allow easy stripping without causing damage or stress to the grout. if the formwork is to b e removed when the grout is still green.
7. If grout is to be pumped under pressure , formwork should be constructed to withstand the additional localised pressure .

PREPARATION FOR GROUTING:

1. Before final fixing of the formwork, remove all dirt and debris from within the are a to be grouted.
2. Saturate the concrete within the formwork with water for 24 hours prior to grouting to ensure a saturated but surface dry condition at the time of grouting.
3. Ensure sufficient grout is available en h a n d to complete the intended pour in a continuous process.
4. Prior to the grout installation mixing equipment must be demonstrated to be suitable and in good working order. Back up equipment should always be available in case of breakdown.
5. Drum type concrete mixers will only be permitted when modified by wire mesh with a mesh size of 12-15 mm over blades inside the drum, to assist in breaking up balls of grout should these occur.
6. Ensure adequate potable water is available for mixing.

Hot weather grouting

7. If grouting is to take place in the open, store bags of grout under shade. Shade the mixing area and the location to be grouted, and ensure that a supply of cool or chilled water is available to produce a maximum mixed grout temperature of
32°C., when placed.
8. A thermometer should be available to monitor ‘as-mixed’ grout temperatures

Cold weather grouting

9. If the temperature of the base concrete cannot be maintained at o r above 5°C whilst the grout hydrates, delay grouting until this can be achieved .
1 0. Use warm water to bring the mixed temperature of the grout above 5°C.
1 1 . if the ambient temperature will fall below 5°C after placing the grout, make sure materials are available to insulate the installation.
1 2. Adjacent machinery should be shutdown if causing vibrations in the pour site.

 

MIXING

1 – Prior to mixing operations, ensure that all standing water is removed from bolt pockets and surrounding areas.
2. individual bags may be mixed with a slow speed (300-500 RPM} , heavy duty drill fitted with a suitable mixing paddle. Multiple bag mixes shall employ dedicated grout mixers or modified drum mixers.
3. The mixing set-up must be able to produce a continuous supply of freshly mixed grout once the pour starts.
4. Place 90% of the mixing water required to achieve the desired consistency into the pail or mixer before adding the begged grout. Maintain water condition within the range given in the appropriate Technical Data Sheet.
5. When the mixed grout is lump free, add the remaining mix water to bring to the desired consistency.

6. Mixing time with drill and paddle will be a minimum of 3 minutes end 4-5 minutes with a drum mixer.

PLACING:

1 . All bolt pockets must be filled with grout before pouring the rest of the uderplate grout, to prevent voids being formed.
2. Start at one end of the base plate, pouring grout down the slope of the formwork. When the grout reaches the far side formwork and rises above the bottom of the base plate, move the pouring point slowly along the length of the base plate,
always ensuring that the grout has risen up on the opposite side of the base plate before moving a.tong.
3. Pour the grout steadly down the slope of the formwork to reduce the possibility of entrapping air.
4. Do not pour from different sides of the base plate a s this ca n cause voids which reduce the effective bearing area.

CURING:

1. If. . Immediately the grout is placed, cover exposed edges with wet rags (cloth retains moisture more effectively than hessian) keeping them wet for 24 hours. After 24 hours remove the formwork.
2. After removing the formwork, brush on MASTERKURE 181 curing. membrane (2 coats), brushing the curing membrane onto the concrete for at least 25 mm from the edge of the grout . Allow the curing membrane to dry, then cover the exposed edges of grout with cloth and keep wet for a minimum of 7 days.
NOTE: Wet curing is the preferred curing method, but it is very rare for the grout to be kept wet 24 hours a day unless very strict supervision is maintained.

Please read also:  Civil Grouting Repair Works
Please read also: Civil Concrete Paving Work
Please read also: Installation of Joint Sealant  CIVIL WORK

Leave a Comment

error: Content is Protected.