JOB SAFETY ANALYSIS FOR FIRE ALARM SYSTEM

JOB SAFETY ANALYSIS FOR FIRE ALARM SYSTEM AND GAS DETECTION DEVICES

No JOB STEPS POTENTIAL HAZARD

(What can cause harm?)

RISK CONTROL MEASURES

(What can be done to prevent it from going wrong)

1. Obtained proper permit for the activity

 

·         No potential incident associated with the activity

 

·         Electrical Manager  will issue the permit for the activity

·         Work Permit System should be followed as per GI 2.100, CSM 1-4

 

 

2. Installation of fire alarm system ·         Incompetent personnel

·         Lack of  trainings, knowledge and experienced

·         Defective tools

·         Hand cutting and laceration

·         Poor communication

·         Electric shock and electrocution

·         Fire and explosion

 

 

·         All personnel must attend the TBM – Tool Box Meeting & TSTI- Total Safety Task Instruction to be conducted by electrical supervisor/foremen/safety staff

·         Personnel must be trained, experienced and competent for the installation techniques of fire alarm system

·         Trained and competent personnel of using suitable tools will carried out cable termination

·         Permit to work system must be followed and LOTO system

·         Use the right tools for the jobs

·         All defective hand & power tools must be repaired or remove from the site and put tag (not in service)

·         Install barricade with signage properly on working area

·         Provision of  two way radio for the good communication

·         Dispose waste materials and segregation properly

·         Fire extinguisher and first kit must be available

·         Wear complete P.P.E. at all times

3. Installation of supports, welding, cutting, drilling ·         Pinch point

·         Cut and laceration

·         Short circuit/ and electric shock

·         Fire and explosion

·         Burn

 

·         Only certified welders must do the welding jobs

·         Ensure that all tools are inspected with color code by competent electrician  and proper maintenance

·         Inspect all extension cables and never overload

·         Ensure that all electrical panels and breakers are proper grounding

·         If needed, ELCB / GFCI should be installed on distribution panels

·         Install adequate lightings at night or dark areas

·         Proper positioning of the body and watch out in pinch point location

·         Use the right tools for the jobs

·         Always focus to the works and be presence of mind

·         Remove all combustible and flammable material around the hot work activity

·         Proper usage of P.P.E. (face shield, apron, etc.)  for welding, cutting, drilling at all times

·         Sufficient fire extinguisher , blankets and fire watch man

·         In case of fire emergencies, isolate the power before tending the fire or call for rescue

·         Apply first-aid and call medical assistance

·         Fire doors shall be kept closed always to control spreading of fire

·         Use the fire extinguisher to extinguish the fire and if the fire continuously  and call emergency

4. Working at elevated working platform and scaffold platform  ·         Fall

·         Drop

·         Scaffold inspector or supervisor must be ARAMCO certified

·         Ensures the types of scaffolds shall be designed, constructed, inspected, tagged and used per GI 8.001 and CSM II-2 scaffolding.

·         Tower shall be erected by trained and competent persons and should be stable with maximum height to base ratio not exceeding 3:1 for use

·         Falling protection will be established

·         Ladder will only be used for access and not for working platform and will be tied or footed at all times when used

·         Scaffold working platform will be inspected by a competent person with updated scaff tag

·         All workers shall be wear full body harness at more than 1.8 meters from ground level and 100% tie off required

·         Use tool bag, rope with pulley to transfer of tools and materials from ground level to the top level.

·         Never taking shortcuts to transfer in deferent platform

·         Apply 3 point contacts when climbing or going down of ladders and always facing the ladder

5. Moving platform (man lift) ·         Striking object

·         Tip over

·         Struck by falling object

·         Lift overturn

·         Fall

·         Fitted with PWAS

·         The mobile equipment shall be certified by 3rd party agency 

·         Operator must be ARAMCO certified.

·         Any mobile equipment which is taken to be platform shall be stored in safe manner and out of access/egress routes.

·         Red and white warning tape shall be used to highlight any objects which protrude into access/egress routes

·         Do not exceed vertical or horizontal reach limit or

·         The loading capacity of the lift

·         Keep all workers and unauthorized person away from the raised boom

·         Materials must be secured properly from the bucket

·         Always setting the brake, engage the power or lower the out rigger

·         Keep both feet on the floor of the man lift basket

·         Weight of the operator and tools should not exceed the designed load limit set by the manufacturer

·         Do not lean over the man lift basket or reach too far or you may lose your balance

·         Full body harness should be hooked to the anchor point specified on the operator’s manual and 100% tie off required

·         The movable material on the moving platform shall be fixed or removed.

6. Painting operation

(touch up paint)

·         Fume, mist inhalation, skin burn, eye irritation

·         Fire emergency

·         Toxic atmosphere

·         Burn & injury

·         Trained and certified personnel of painting should perform the job

·         Avoid inhalation, skin contact, spray under well ventilated condition

·         Working areas shall be well ventilated

·         Clean air-mask frequently

·         If your eyes were accidentally comes in contact with harmful chemicals, your eyes should be cleaned with clean water 10 to 15 minutes, if still irritated, contact medical assistance immediately

·         Paints, thinners are to be keep away from fire or flame

·         In case of fire emergency, PCP fire extinguisher are to be used

·         Recue victim and applied first-aid and call medical assistance

·         Thinners, paints shall be stored at well ventilated, open and covered shelter.

·         Provide SDS – safety data sheet in workplace

 

7. Working in confined space area ·         No Confined Space Entry PTW and training

·         Hazardous atmosphere

·         Poor illumination

·         Oxygen deficiency/enrichment

·         Poor communication

·         Provide confined space  entry (CSE) PTW as per GI 2.100, CSM 1-4, work permit system

·         Provide gas test with competent person as per GI 2.709, gas testing procedure,  CSM 1-6 confined spaces

·         Isolate all lines connected with confined space area, put Lockout and hold tags as per GI 6.012

·         Ensure all personnel are trained and certified

·         Designated hole watch man with confined space log sheet (IN/OUT)

·         Provide barricade and safety signage (confined space area and gas test required)

·         Provide ventilation fan and lights

·         Provide safe access & egress

·         Constant communication between the entrant and standby man/ hole watch man

·         Provide rescue equipment

·         Wear complete required P.P.E. at all times as per

8.  

Manual handling

·         Drop

·         Cuts

·         During manual lifting of materials, the body shall be straight up, not bent

·         Shall not exceed the lifting capabilities

·         Suitable P.P.E. shall be worn to protect feet and legs, load shall be secured prior to lifting

·         A safe work practice shall be implemented to reduce the possibilities of accident caused by lack of communication

·         Personal Protective Equipment (PPE) shall be worn at all times.

9. Housekeeping ·         Trips, slips, falls ·         Removed unnecessary materials around the working area

·         Properly disposal of waste materials after the activity

·         Covered open holes and put signage

10. Weather condition

 

·         Working direct

·         Sun light heat stroke.

·         Should ensure that all labors should be provided cool water and shelter avoid such condition (glucose powder to be added rather salt tab.) 

·         Should maintain and give at least 15 mins. Rest for those mechanic working direct sunlight to avoid dehydration

·         Employees to try to work and take breaks in the shade. Be aware that sunburn can occur even when in the partial shade or when cloudy.

·         Employees should drink plenty of water to avoid dehydration

 

·         Poor visibility cause by fog and sand storm ·            Should stop the work if poor visibility to avoid any accident of

damage to property

 

 

 

·         Wet cause by rain and water cleaning

 

·         Slippery

·         Ensure the electrical panel are sealed and covered

·         Inspect  the equipment and electrical before starting the activity