Job Safety Analysis for General Work in Building, Plant or Refinery

Job Safety Analysis for General Work in Building, Plant or Refinery

Description Task

Hazard/Potential Incident

Control Measure

General work 1. Dust
2. Noise
3. Ground water
1.1 Suitable PPE should be permitted using.
2.1 Use face shield ear plug.
3.1 Wearing suitable shoes and dewatering.
Use electrical tools & petroleum equipment . 1. Fire
2. Electric shock
3. Slips, Trips and Falls
1.1 Prepare extinguisher and other PPE.
2.1 Keep dry condition for electrical tools and cable.
3.1 Good house keeping.
Preparation and Start work. 1. Extreme hot temperature

2. Poor manual handling
3. Poor practices on maneuvering heavy equipment

1.1 implode staggered working hours. Include subscription of workforce to allow sufficient rest in between employees.
1.2 Provision of cool drinking water and shaded rest place.
1.3 Supervisor shall monitor their work force by looking for signs of dehydration.
2.1 Maintain proper back posture and body position during manual lifting of materials. Position body where less effort is exerted and less strain.
2.2 Use crane, forklift or manual lifters for heavy loads.
2.3 Divide load weight between co-workers.
2.4 Assign additional person at the trailer best to assist for loading/arranging small bore pipe spool.
2.5 Assign sufficient numbers of personnel who could sustain the load when doing manual handling.
2.6 Observed proper communication between co-workers during execution of specified task.
3.1 Heavy equipment operators/drivers must undergo manual lifting of materials. Position body where less effort is
exerted and less strain.
3.2 Equipment should have blinker Iight/sound.
3.3 Provide PWAS to equipment.
3.4 Assign banks-manor signalman to direct maneuver of heavy equipment.
3.5 Install barricade tapes and provide warning signs to inform all employees present in the worksite.
Lifting of steel structure. 1. Collapse of crane.
2. Fall of materials during lifting.
3. Hit on workers, adjacent building, and power lines.
4. Wire and Clip injure.
5. Cut injuries.
1.1 Crane must be inspected and approved by HSE prior to induction.
1.2 Must be positioned in a stable surface.
1.3 Operator must be qualified and experienced.
1.4 Operator must check the crane before start work.
1.5 Do not over load the crane.
2.1 Do not over load the crane.
2.2 Sling must of rated capacity Damaged sling do not use.
2.3 Check the sling prior to use.
2.4 Do not lift loose materials.
2.5 Assign a qualified and experienced rigger
3.1 Barricade the area and sign board.
3.2 Assign flag man to control equipment and workers.
3.2 Assign flag man to control equipment and workers.3.3 Use tag line for directional control ofload.
3.4 Keep safe distance while working near power lines.
3.5 Check the proximity of adjacent building before positioning the crane
4.1 Wear PPE.
5.1 Prepare Access road.
Permit Application. 1. Hazardous activities without sufficient.
2. Preparation & safety measures.
1.1 No permit -no work

2.1 Read and understand permit prior to commencement of work. Ensure compliance with permit requirements

Working at Height. 1. Fall down 1.1 Approved safety harness with 2 lanyards shall be used
and 100% tie off on a secured anchor points.
1.2 Suitable scaffolding should be prepare
1.3 Wind condition shall be checked
Collapse of Man-basket. 1.Serious physical damage & properties damage 1.1 The ground is compacted.
1.2 Maintain adequate space.
1.3 Check the ground for crane.
1.4 Banks-man is assigned.
1.5 Barricade, warning sign to be installed.

Leave a Comment

error: Content is Protected.