Installation
Verify that all demand detection zones have been installed. |
Verify that all passage detection zones have been installed. |
Verify that all queue detection zones have been installed. |
Check for indication of broken, cut, or exposed loop or lead-in wires. |
Check for exposed wire or missing sealant in loop slots. |
Verify that all lead-in wires have been properly twisted to avoid crosstalk and properly labeled. |
Verify loop lead in cables are properly identified and labeled in the cabinet and pull box specials. |
Verify that each loop is connected to the correct terminals on the input file. |
Verify the sensitivity on each loop amplifier channel (default value shall be 2). |
Verify that all unused channels of loop amplifiers are disabled. |
Verify that loop amplifiers are configured for 6’x6’ loops and set on presence detection rather than pulse. |
Verify that all detection zones properly register the appropriate calls. |
Verify that the right side signal assembly is properly installed and signal heads operate correctly. |
Verify that the left side signal assembly is properly installed and signal heads operate correctly. |
Verify that the mast arm signal assembly is properly installed and signal heads operate correctly. |
Verify that the right side advance flashing beacon assembly is properly installed and operational. |
Verify that the left side advance flashing beacon assembly is properly installed and operational. |
Verify that the tripping of 208 watchdog timer card causes the signal heads and advance flashing beacons to go into yellow flash. |
Verify all equipment is properly grounded. |