SAES-L-102 PDF Download – Regulated Vendors List for Valves

This article is about Regulated Vendors List for Valves of document SAES-L-102 PDF Download.

This standard outlines approved manufacturers for SAMS Class 04 materials. The purpose of this identification is to establish a list of manufacturers whose materials meet the specified requirements and standards for use in Saudi Aramco projects. By listing acceptable manufacturers, the standard ensures that the materials used in Class 04 applications are of high quality and adhere to the necessary standards and specifications.

The inclusion of approved manufacturers in the standard simplifies the selection process for procurement and construction teams. Instead of researching and evaluating various manufacturers, the teams can rely on the pre-approved list provided by the standard. This not only streamlines the procurement process but also enhances consistency and quality across projects.

To be included as an acceptable manufacturer for SAMS Class 04 materials, manufacturers typically undergo a rigorous evaluation process. This evaluation involves assessing factors such as the manufacturer’s production capabilities, quality control procedures, adherence to industry standards, and past performance. Only manufacturers that consistently meet or exceed these criteria are added to the approved list.

The use of an approved manufacturer list also ensures that materials used in Class 04 applications are compatible and interchangeable. Since the listed manufacturers have been evaluated and approved based on their ability to produce materials that meet the required specifications, there is a higher level of confidence in the performance and reliability of the materials.

It’s important to note that the list of approved manufacturers may be periodically updated to reflect changes in the industry, advances in technology, or shifts in quality standards. This ensures that the list remains relevant and up-to-date with the latest developments.

SAES-L-102 PDF Download

SAES-L-102

FAQs about SAES-L-102 PDF Download

  1. What is Approval:

    Written authorization granted by the Manager of the Consulting Services Department at Saudi Aramco in Dhahran. This authorization signifies the official endorsement for a particular action or process.

  2. What is Acceptable:

    A condition indicating that formal approval isn’t required before placing a purchase order for a product. However, once the order is initiated, the supplier must ensure full compliance with all terms and aspects of the purchasing contract, including adherence to the Saudi Aramco Materials System Specification.

  3. What is CCC:

    Commodity Classification Code, a code used to classify and categorize commodities or products based on their characteristics, use, or other relevant factors.

  4. What is 9COM:

    Commodity Code, a code used to categorize specific commodities or products based on various attributes, facilitating organizational and regulatory processes.

  5. What is License Agreement:

    A formal contractual arrangement between a supplier and the holder of rights to an equipment design. This agreement allows the supplier to assemble equipment using the design owner’s components, their own manufactured components, or a combination of both. The agreement typically entails compliance with manufacturing procedures and branding requirements specified by the design owner.

  6. What is Made:

    A term indicating the creation of a product from raw materials or the assembly of components by the manufacturer.

  7. What is Manufacturer:

    This term can refer to either the entity that owns the brand name of the equipment or a licensee that operates under a license agreement with the design owner to produce the equipment.

  8. What is SAMSS:

    Saudi Aramco Materials System Specification, a comprehensive specification outlining the requirements, standards, and guidelines for materials used in Saudi Aramco projects.

  9. What is Supplier:

    An individual, company, or entity responsible for providing the required equipment or products to Saudi Aramco in accordance with the specified terms and conditions.

Leave a Comment

error: Content is Protected.