This article is about Page Party Accessories Checklist for Public Address System of Page Party P.A. System as per International Codes and standards.

Page Party Accessories Checklist for Public Address System

Verify Received materials have been inspected for damage and for compliance to applicable requirements.
Verify Equipment Storage and Protection is as per Manufacturer’s Recommendation.
Verify that the received materials are new and unused.
Verify that material and accessories are in accordance with the Saudi Aramco-approved project-specific design drawings, diagrams, schedules, lists, databases, and associated design documents
Verify the received Speaker material Comply with the project PO specification and shall conform to all applicable requirements, standards, and specifications prior to release to be used as part of the work.
Verify all received station handsets are designed to be disconnected from the communications network whenever the handset is on-hook (not in use).
“Verify that the enclosures for “”in-plant party paging communications equipment comply with;
NEMA type 12 – for indoor, non hazardous locations
NEMA type 4X – for outdoor non hazardous location”
Verify the enclosures for hazardous locations (Class I Division 1 & 2), comply with NEMA type 7 in addition to NEMA type 4X.
Verify that specification for station interconnection cables meet SAES-T-481
Verify the number of Acoustical booths received for the party paging stations in areas where ambient noise levels exceeds 80 dBA, meets the number as per the PO.
Verify Equipment and materials identification procedure is implemented for the received items.
Ensure that equipment and accessories shall be traceable from the manufacturer and supplier through delivery, storage, fabrication, erection, installation, repair, modification and use.

Standards Codes and References for Page Party Station

SAES-T-481 “Powered In Plant Communications.

Page Party P.A. System Installation and Commissioning Checklist

Page/Party Speaker Cable Materials Inspection Checklist

Page/Party P.A. System Speaker Materials Inspection Checklist

Page Party Station Inspection Checklist for Public Address System

Page Party Station Speaker/Amplifier Inspection Checklist for Public Address System

Page Party Accessories Checklist for Public Address System

Integrated Automation System References and Standards

 


Discover more from PAKTECHPOINT

Subscribe to get the latest posts to your email.

Leave a Comment

error: Content is Protected.