Page Party Station Speaker/Amplifier Inspection Checklist for Public Address System

This article is about Page Party Station Speaker/Amplifier Inspection Checklist for Public Address System of Page Party P.A. System as per International Codes and standards.

Page Party Station Speaker/Amplifier Inspection Checklist for Public Address System

  1. Received materials have been inspected for damage and for compliance to applicable requirements
  2. Verify that the received materials are new and unused.
  3. Verify that material and accessories are in accordance with the Saudi Aramco-approved project-specific design drawings, diagrams, schedules, lists, databases, and associated design documents
  4. Verify the received Loudspeakers for the in-plant party paging communications meets the requirements of UL 1480 (UL Standard for Safety Speakers for Fire Protective Signaling Systems) recommendations.
  5. Verify the loudspeaker driver-coil (voice coil) impedance is either 8 ohms or 16 ohms.
  6. Verify All speaker components, including driver, horn and mounting hardware is made of corrosion and impact resistant material.
  7. Verify Equipment Storage and Protection is as per Manufacturer’s Recommendation
  8. Verify all equipment and components received comply with the project PO specification and shall conform to all applicable requirements, standards, and specifications prior to release to be used as part of the work.
  9. Verify that the volume level of the received speaker amplifier is internally adjustable.
  10. Verify Equipment and materials identification procedure is implemented for the received items.
  11. Ensure that equipment and accessories shall be traceable from the manufacturer and supplier through delivery, storage, fabrication, erection, installation, repair, modification and use.

Standards Codes and References for Page Party Station Speaker/Amplifier

SAES-T-481, Powered In-Plant Communications.

Page Party P.A. System Installation and Commissioning Checklist

Page/Party Speaker Cable Materials Inspection Checklist

Page/Party P.A. System Speaker Materials Inspection Checklist

Page Party Station Inspection Checklist for Public Address System

Page Party Station Speaker/Amplifier Inspection Checklist for Public Address System

Page Party Accessories Checklist for Public Address System

Integrated Automation System References and Standards


Discover more from PAKTECHPOINT

Subscribe to get the latest posts to your email.

Leave a Comment

error: Content is Protected.