ARAMCO STANDARD SAES-P-104 Wiring Methods and Materials

This article is about ARAMCO STANDARD SAES-P-104 Wiring Methods and Materials  and focusing to the engineers, technicians and supervisors. You will find lot of documents related to this article. Just navigate our website  www.paktechpoint.com  and find more articles. Please! Do not forget to subscribe our You tube channel also. Thanks in Advance.

PLEASE SUBSCRIBE OUR PAKTECHPOINT YOUTUBE CHANNEL

ARAMCO STANDARD SAES-P-104 Wiring Methods and Materials

Main topics to be discussed in this PDF and references of pages.

1 Scope……………………………………………………. 2
2 Conflicts, Deviations and Commentary………. 2
3 References…………………………………………….. 3
4 General………………………………………………….. 8
5 Wire and Cable……………………………………….. 8
6 Connections and Terminations……………….. 12
7 Enclosures……………………………………………. 15
8 Conduit, Conduit Fittings and Supports……. 17
9 Cable Trays………………………………………….. 20
10 Underground Cable Systems………………….. 22
11 Submarine Power Cable………………………… 26
12 Cable Sizing…………………………………………. 27
13 Cable Testing After Installation……………….. 30
14 Cable Separation…………………………………… 33
15 Conduit and Cable Sealing…………………….. 34

SAES-P-104

Index of Electrical Standards International

1.    ARAMCO STANDARD SAES-P-100 BASIC POWER SYSTEM DESIGN CRITERIA
2.    ARAMCO STANDARD SAES-P-101 Regulated Vendors List for Electrical Equipment
3.    ARAMCO STANDARD SAES-P-103 UPS AND DC SYSTEM
4.    ARAMCO STANDARD SAES-P-104 Wiring Methods and Materials
5.    ARAMCO STANDARD SAES-P-107 Overhead Distribution Systems
6.       ARAMCO STANDARD SAES-P-111 Grounding
7.    ARAMCO STANDARD SAES-P-113 Motors and Generators
8.    ARAMCO STANDARD SAES-P-114 Power System Protection and Control
9.    ARAMCO STANDARD SAES-P-116 Switchgear and Control Equipment
10.   ARAMCO STANDARD SAES-P-119 SUBSTATION
11.  ARAMCO STANDARD SAES-P-121 TRANSFORMERS AND REACTORS
12.  ARMACO STANDARD SAES-P-123 LIGHTING
13.  ARAMCO STANDARD SAES-P-126 Power System Automation

paktechpoint.com

You may also like...

13 Responses

  1. September 8, 2018

    […] to comply with SAES-P-104 (Article 9.8)(ARAMCO standard), which states that for extending the cable from cable tray to equipment, the […]

  2. December 30, 2018

    […] cables of different voltage levels/service are run in parallel, segregation is in accordance with SAES-P-104, SAES-J-902 Section 14.1 through 14.2 or IFC […]

  3. January 3, 2019

    […] the latest construction drawings and the applicable documents shall be SAES-J-902, NEMA VE-2, SAES-P-104 and […]

  4. March 6, 2019

    […] voltage cables shall be DC high-potential tested in accordance with SAES-P-104 (It is aramco […]

  5. March 6, 2019

    […] High voltage cables shall be DC high-potential tested in accordance with SAES-P-104 Para. 13. […]

  6. March 6, 2019

    […] and Installation of Wiring and Cable Systems shall be in accordance with the NEC as supplemented by SAES-P-104 and/ or as approved Saudi Aramco […]

  7. March 6, 2019

    […] Terminate all wiring or cable connections according to the termination schedule, installing all termination requirements including identifications required, in which non-corroding material with cable reference numbers, as noted in the cable schedule, are clearly visible. Cabling and wiring works shall be done as   per  SAES-P-104. […]

  8. March 7, 2019

    […] Conduit fittings for outdoor rigid steel conduit shall be cast or forged steel, cast iron or malleable iron, either hot-dip galvanized (preferably), or Zinc electroplated as supplied by approved manufacturer. Refer to SAES-P-104, sec 8.9 para 8.9.1. […]

  9. March 27, 2019

    […] along the branch trench, cable tags installation and protection tiles installation must conform to SAES-P-104. Mark the cable route in accordance with for construction standard […]

  10. April 14, 2019

    […] ARAMCO STANDARD SAES-P-104 Wiring Methods and Materials […]

  11. April 15, 2019

    […] 4.    ARAMCO STANDARD SAES-P-104 Wiring Methods and Materials […]

  12. November 14, 2019

    […] of steel or iron, either hot dip galvanized (preferably as supplied by the manufacturer). Refer to SAES-P-104 sec. 8.10 para. […]

  13. April 3, 2020

    […] acceptable and in accordance with Saudi Aramco Engineering Standards and contractual requirements. (SAES-P-104, Sec. 13.6 and NETA ATS 2009, Sec. […]

Leave a Reply

error: tected !!Content is pro
%d bloggers like this: