Page/Party Power Cable Materials Inspection Checklist

This article is about Page/Party Power Cable Materials Inspection Checklist of Page Party P.A. System as per International Codes and standards.

Page/Party Power Cable Materials Inspection Checklist

  1. Verify that received materials have been inspected for damage and for compliance to applicable requirements.
  2. Verify material storage and protection is as per Manufacturer’s Recommendation.
  3. Verify that the received material comply with the project PO requirements and specification.
  4. Verify that the received materials are new and unused.
  5. Verify that cable and accessories are in accordance with the Saudi Aramco-approved project-specific design drawings, diagrams, schedules, lists, databases, and associated design documents
  6. For outdoor storage, verify that firm support for storage of reels is provided. If possible reels to be stored indoors on a hard dry surface.
  7. Verify that cable reels in outdoor locations are supported off the ground and provided with a weatherproof cover.
  8. Verify that received cables is UL listed for indoor and outdoor applications. Cables installed within a building shall be listed as being resistant to the spread of fire in accordance with National Electrical Code (NEC) Article 800-50 and Article 800-51.
  9. Verify that the outer jacket of the cables is made of hard service, flame retardant and moisture and ultraviolet resistant material to provide protection from oil, chemical, mechanical and other environmental abuse.
  10. Verify Equipment and materials identification procedure is implemented for the received items.
  11. Ensure that equipment and accessories shall be traceable from the manufacturer and supplier through delivery, storage, fabrication, erection, installation, repair, modification and use.

Standards Codes and References for Page/Party Power Cable Materials

SAES-T-481 “Powered In Plant Communications.

Page Party P.A. System Installation and Commissioning Checklist

Page/Party Speaker Cable Materials Inspection Checklist

Page/Party P.A. System Speaker Materials Inspection Checklist

Page Party Station Inspection Checklist for Public Address System

Page Party Station Speaker/Amplifier Inspection Checklist for Public Address System

Page Party Accessories Checklist for Public Address System

Integrated Automation System References and Standards

Copper Cable Storage, Handling and Preservation Checklist

Copper Cable Underground Installation & Commissioning | Telecommunication

Telecom Cable Rack Material Selection and Receiving Checklist

Pedestal Installation And Pre Commissioning & Telecom OSP Circuits


Discover more from PAKTECHPOINT

Subscribe to get the latest posts to your email.

Leave a Comment

error: Content is Protected.