Pre-Installation Requirements Inspect exterior and interior of sign for damage. Visually inspect power terminations within sign at main lugs and power supplies. Verify that…
This method statement will cover the minimum requirements for installation of static machinery, such as reactor, columns, drums, shell & tube exchanger, packages equipment,…
This Procedure / Method Statement will serve as a minimum guidelines to carry out the vessel dress-up activities in plants and refineries. The following keywords…
Industry Codes and International standards for Erection of Reciprocating Compressor REIE 686 Recommended Practices for Machinery Installation and installation design Pl-618 Reciprocating compressor for…
Current transformer (CT) test procedure This test is considered as one of the main test, it’s aimed to test: Current transformer ratio. Current transformer…
This test aimed to test relay’s output contact, pick-up and drop off voltage, operating and resetting time. Required equipment for Auxiliary Relay Test Sverker…
Motor Starters and Contactors Magnetic starters provided by the contractor shall be minimum NEMA Size 1, complete with thermal overload relay heater element for…
Terminal Lugs All terminations shall be self-tested after installation by pulling on wire with a moderate force to ensure the integrity of crimped lug…
The contractor’s responsibility shall include, but is not limited to, the following: The contractor shall provide with written acceptance of all furnished cable reels.…