Telecom Cable Management Trays – Material Receiving Checklist

This article is about Material Receiving Checklist for Telecom Cable Management Trays of Building Telecom Distribution System as per International Codes and standards.

Telecom Cable Management Trays – Material Receiving Checklist

  1. Received materials have been inspected for damage and for compliance to the requirements of the approved PO.
  2. Verify that received cable management trays, fittings and accessories are new and unused.
  3. Verify that received cable management trays, fittings and accessories are in accordance with the Saudi Aramco-approved project-specific design drawings, diagrams, schedules, lists, databases, and associated design documents.
  4. Verify that all cable management trays and components received comply with the project PO specification and shall conform to all applicable requirements, standards, and specifications prior to release to be used as part of the work.
  5. Verify material handling, storage and preservation is as specified in all applicable specifications, manufacturer recommendations and SAUDI ARAMCO’s standards.
  6. Verify that materials identification procedure is implemented for the received items.
  7. Ensure that material and accessories shall be traceable from the manufacturer and supplier through delivery, storage, fabrication, erection, installation, repair, modification and use.

Standards Codes and References for Telecom Cable Management Trays

1. SAES-T-916, Telecommunications Building Cable Systems.
2. Commercial Building Standard for Telecommunications Pathways and Spaces.

Telecom Closet / Telecom Equipment Room Size And Location.

Telecommunications Infrastructure Design Process.

J-STD-607-A Commercial Building Grounding (Earthing) and Bonding Requirements For Telecommunications.

ANSI/TIA/EIA 568-B Commercial Building Telecommunications Cabling Standard.

Telecommunications Outside Plant Systems Design SAES-T-938 Download.

Backbone Cable Tray System Installation | Telecom System

Horizontal Cable Tray System Installation | Telecom System

Telecommunication Backbone Connecting Hardware Material Receiving Checklist

Horizontal Connecting Hardware Material Receiving Checklist | Telecommunication


Discover more from PAKTECHPOINT

Subscribe to get the latest posts to your email.

Leave a Comment

error: Content is Protected.